《TP483000D Telecom Power Installation Guide》 Issue 02 Date 2022-01-30
1. TP483000D Cabinet Configuration
AC cabinet: TPA38631B-N20C, TPA38401B-N20C1
Rectifier cabinet: TPR48202B-N20C5 , TPR48302B-N20C5
DC cabinet: TPD48202B-N20C1, TPD48302B-N20C1
Intelligent PDC: TPD48202B-N20C6
Lithium battery cabinet: TBC1000B-NDA1
Rectifier: R48100G1
2. Installing Communications Cables
2.1 Installing CAN Communications Cables Between Cabinets
Context
The AC cabinet, rectifier cabinet, and DC cabinet communicate with each other through CAN communications cables. If there are multiple rrectifier cabinets, connect the CAN communications cable to rectifier cabinet 1 (master cabinet). Procedure
Step 1 Locate the CAN communications cable in the fitting bag.
Step 2 Connect the RJ45 connector at one end of the CAN communications cable to the CAN port on the monitoring unit SMU02C in the rectifier cabinet, signal detection board in the AC cabinet, and the CAN 1 port on the DC signal detection board in the DC cabinet.
Step 3 Bind the CAN communications cable to the rodent-proof mesh on the top of the cabinet.

Step 4 Connect CAN communications cables between adjacent cabinets.
NO TE
● If multiple cabinets are cascaded using CAN communications, a build-out resistor needs to be installed in the cabinet (AC cabinet, DC cabinet, or intelligent power distribution cabinet) that is the furthest from the rectifier cabinet (Master).
● Only one build-out resistor needs to be installed in the power system

2.2 Installing Communications Cables Between RectifierCabinets
Context
If multiple rectifier cabinets are configured communications cables need to be installed between the rectifier cabinets.
Procedure
Step 1 Locate the communications cable in the fitting bag.
Step 2 Install communications cables between rectifier cabinets.