SUN2000 Medium-Voltage On-Grid Typical Application Scenario

512 0 0 0 0

For this scenario, generally, the capacity of a grid-tied unit is 1–2.5 MW. The voltage on the transformer high-voltage side is between 10 kV to 35 kV. Communication is implemented by connection to the central monitoring room over the optical fiber ring network.


In most cases, large-sized PV power stations require a 35 kV/110 kV (220 kV) booster station. The AC side mostly uses the delta connection, and the N cable can be spared. The power grid is relatively clean with low harmonic content, therefore the PLC communication mode can be used.


033328yjad14j4rd61r1zs.png?image.png


For technical data sheets, user manuals and other usefull information please access the folowing link: http://solar.huawei.com/eu/services (Download Center).


033611aidsod7ddeeo7ozf.png?image.png




Comment

You need to log in to comment to the post Login | Register
Comment

Notice: To protect the legitimate rights and interests of you, the community, and third parties, do not release content that may bring legal risks to all parties, including but are not limited to the following:
  • Politically sensitive content
  • Content concerning pornography, gambling, and drug abuse
  • Content that may disclose or infringe upon others ' commercial secrets, intellectual properties, including trade marks, copyrights, and patents, and personal privacy
Do not share your account and password with others. All operations performed using your account will be regarded as your own actions and all consequences arising therefrom will be borne by you. For details, see " User Agreement."

My Followers

Login and enjoy all the member benefits

Login

Block
Are you sure to block this user?
Users on your blacklist cannot comment on your post,cannot mention you, cannot send you private messages.
Reminder
Please bind your phone number to obtain invitation bonus.