Hello friend, I want to share with you my experience when installing a network element and we will take the OSN 3500 as an example.
First it is necessary to verify the packing list in the warehouse and verify that everything contracted is in the warehouse and there is no pending package to arrive or is retained in customs.
Then it is important to study well the documentation about the network element and the cabinet that will house the equipment. In the case of the OSN 3500 we have two cabinets the N63E and the N66T. With all the documentation that comes with the equipment but before it arrives you can search with the hedex and study it in detail and with the necessary tools that also comes in the documentation, you are ready for assembly.

That's all I hope you like it and comment on it.

