Before you install the eA680, unpack and inspect the equipment delivered to the site and prepare the related tools.
1. Prerequisites
Perform the following operations to inspect the goods delivered to the site:
a. Unpack the equipment, count the total number of items based on the packing list attached to each packing case, and check whether each packing case is intact.
b. Check whether the models and quantities are consistent with those specified on the Packing List.
c. Record the serial number of the CPE (From the CPE box on the two labels in the S / N bar code torn off, posted on the record book).
2. Precautions
a. Power on a CPE within 24 hours after unpacking it. If you power off a CPE for maintenance, restore power to the CPE within 24 hours. Keep the CPE dry in humid environment.
b. To avoid direct lightning, CPE must be installed in the protection angle of 45 degrees below a separate lightning rod, or protection angle of 45 degrees below a surrounding high-rise building.
c. Ensure that there are no obstacles facing the CPE, and enable the CPE to face the base station.
3. Installation Tools
Table 1 lists the tools used for installing the eA680
Table 1
![]()
You are welcomed to visit our “Enterprise Wireless Information Center” for further document.
http://support.huawei.com/onlinetoolsweb/elte/Info_en.jsp
This post was last edited by Mr.Bright at 2019-01-11 03:30.
