Got it

HUAWEI E9000 Server Components installation and Replacement [Video]

29 0 0 0 0

Hi, everyone!

The post will share with you how to install and replace the components on the E9000 Server.


Installing Adjustable Guide Rails for the E9000 server


Installing the E9000 Chassis on Adjustable Guide Rails


Installing and Replacing a Half-width Compute Node on the E9000


Installing and Replacing a Full-width Compute Node on the E9000


Installing and Replacing a Liquid-Cooled Compute Node on the E9000


Installing and Replacing a Management Module on the E9000


Installing and Replacing a Switch Module or Pass-Through Module on the E9000


Installing and Replacing an AC PSU on the E9000


Installing and Replacing a DC PSU on the E9000


Installing and Replacing a Fan Module on the E9000


Comment

You need to log in to comment to the post Login | Register
Comment

Notice: To protect the legitimate rights and interests of you, the community, and third parties, do not release content that may bring legal risks to all parties, including but are not limited to the following:
  • Politically sensitive content
  • Content concerning pornography, gambling, and drug abuse
  • Content that may disclose or infringe upon others ' commercial secrets, intellectual properties, including trade marks, copyrights, and patents, and personal privacy
Do not share your account and password with others. All operations performed using your account will be regarded as your own actions and all consequences arising therefrom will be borne by you. For details, see " User Agreement."

My Followers

Login and enjoy all the member benefits

Login

Block
Are you sure to block this user?
Users on your blacklist cannot comment on your post,cannot mention you, cannot send you private messages.
Reminder
Please bind your phone number to obtain invitation bonus.