Hello, friend!
You can run the system switch-over command to perform a manual active/standby switchover. When you need to manually switch the active control board, for example, to perform annual maintenance on the active control board, run this command. After the active/standby switchover is performed successfully, the original standby control board becomes the active control board, and the original active control board becomes the standby control board.
The system displays "Are you sure to switch over? (y/n)[n]" after this command is entered successfully. To perform the active/standby switchover, type y; otherwise, type n.
2. After the active/standby switchover is complete, the board in the auto-discovery state is reset, and other service boards are in the normal state.
3. Run the ping command to check the network host connection and host reachability to verify service continuity.
Thanks!