Got it

How to prepare before comission the system of NetCol8000?

Latest reply: May 18, 2018 07:07:21 1865 2 0 0 0
How to prepare before comission the system of NetCol8000?

Before commissioning the system, ensure that:
The chilled water inlet and outlet pipes and the humidifier water supply pipe and
drainpipe are free from leaks and blockages.
The input voltage and frequency of the main power supply are within the nominal ranges
and the phase sequence is correct.
Power cables, signal cables, and communications cables have been correctly connected

The voltage derivation of the main power supply is 10% at most, and the main control
board voltage is less than or equal to 24 V AC (tolerance ±10%).

Before powering on and commissioning the upflow unit, remove the film from the return
air grating on the front door.

View more
  • x
  • convention:

Thank for sharing:)
View more
  • x
  • convention:

Comment

You need to log in to comment to the post Login | Register
Comment

Notice: To protect the legitimate rights and interests of you, the community, and third parties, do not release content that may bring legal risks to all parties, including but are not limited to the following:
  • Politically sensitive content
  • Content concerning pornography, gambling, and drug abuse
  • Content that may disclose or infringe upon others ' commercial secrets, intellectual properties, including trade marks, copyrights, and patents, and personal privacy
Do not share your account and password with others. All operations performed using your account will be regarded as your own actions and all consequences arising therefrom will be borne by you. For details, see " User Agreement."

My Followers

Login and enjoy all the member benefits

Login

Block
Are you sure to block this user?
Users on your blacklist cannot comment on your post,cannot mention you, cannot send you private messages.
Reminder
Please bind your phone number to obtain invitation bonus.