1.1 eSight-based One-Click Log Collection
Currently, eSight does not support log collection.The one-click log collection process on the eSight is similar to that on the Web LMT.
1.2 NIC-based One-Click Log Collection
Step 1 Log in to the U2000, and choose Maintenance > Network Information Collection, as shown in the following figure.
![]()
Step 2 On the Task List tab page of the displayed Network Information Collection page, choose Create Task > Based on Scenario, as shown in the following figure.
![]()
Step 3 In the Scenario Task Creation Wizard dialog box, specify the task-related parameters, and click Next, as shown in the following figure.
![]()
Step 4 In the displayed dialog box, select one or more NEs, and click Next if other parameters do not need to be set, as shown in the following figure.
![]()
Step 5 When the progress of the collection task reaches 100%, click Download in the Collection Result column to save the collection results to the local PC, as shown in the following figure.
![]()
----End
If the CPU usage of an AirNode is high, control flow will be performed for O&M-related tasks, such as tracing and logging, to ensure stable service running. The flow control mechanism is as follows:
If the CPU usage of platform tracing and performance monitoring is higher than 70%, flow control is triggered and the tracing task is deleted. Accordingly, the task on the U2000 or Web LMT is suspended. After the CPU usage falls below 70%, flow control is canceled, and the tracing tasks need to be manually restarted.
Flow control also applies to the S1, X2, and Uu interfaces. If the CPU usage is higher than 70%, data is not reported during S1, X2, or Uu interface tracing. If it becomes lower than 50%, data reporting automatically restores. Therefore, if the CPU usage ranges from 50% to 70%, a tracing task may be successfully started but the tracing data on the S1, X2 or Uu interface may not be reported.
1.3 Software Version Information Collection
Step 1 On the U2000, choose Maintenance > MML Command, as shown in the following figure.
![]()
Step 2 On the displayed MML Command tab page, select the target eAN3810A, and run the LST SWP command, as shown in the following figure.
In the LST SWP command output, the version for which Version Status is Running is the in-use version of the eAN3810A.
![]()
----End
1.4 License Collection
Step 1 On the U2000, choose License > NE License Management > Stand-Alone, as shown in the following figure.
![]()
Step 2 On the displayed Stand-Alone License Management tab page, click License Information Query in the navigation tree, right-click the target license, and choose Export Selected Records from the shortcut menu, as shown in the following figure.
![]()
![]()
----End
1.5 Configuration Information Collection in the In-use Version
Step 1 On the U2000, choose CME > Planned Area > Create Planned Area, as shown in the following figure.
![]()
Step 2
In the displayed Create Planned Area
dialog box, specify Planned area name, enter a keyword in the search box
in the Available NEs pane to search for the target NE, and click the
target NE and then the
icon
to add the target NE to the Selected NEs pane, as shown in the following
figure.
![]()
Step 3 Choose CME > Advanced > Export NE Files, as shown in the following figure.
![]()
Step 4
In the displayed Export NE Files
dialog box, click the target NE in the Available NEs pane and then the
icon
to add the target NE to the Selected NEs pane, specify Path, and
click OK, as shown in the following figure.
The path in the following figure is an automatically generated path.