This post is about equipment relocation. Please check the information displayed below.
THE PROFESSIONAL SERVICE PERSPECTIVE
The equipment relocation service refers to the hardware removal, installation and commissioning of the old equipment. For example, the service adjustment or new service, network topology adjustment, ID change, network management data adjustment and other services involving other network elements are performed according to the relevant service modules. Quote. This service does not include the packaging and transportation of old and used equipment, and does not involve the relocation of equipment from third-party manufacturers.
The equipment relocation service includes two service modes: one includes hardware operation; the other does not include hardware operation (only refers to the service configuration of the relocation device itself and the commissioning of the device); when the equipment relocation service is adjusted to a large scale, by further understanding the real needs of customers, the following service opportunities may exist: network topology adjustment; service configuration and route optimization; newly opened service services; evaluation of network resources and service support capabilities; network ID optimization; network management data adjustment.
RELOCATION FEASIBILITY ASSESSMENT
1. Circuit board (OSN3500), optical module length.
2. Wavelength division: The distance between the optical cable increases, the attenuation of the optical cable increases, and the influence of the increased distance between the multiplex sections (OTM) on the system is required.
Collect the existing network data, optical cable distance, networking, optical distribution configuration, OSNR data, and send it to the product manager for evaluation using MDS6600. After evaluating the increase of the relocation distance, the attenuation will increase, and the optical layer configuration will be optimized. To join the zoom station. Previously it was ordinary light, whether it was necessary to use high-power light, and whether it was necessary to introduce Raman.
The distance is increased, and the 10G wavelength division system needs to consider the configuration change of the dispersion.
Whether the type of light release and light release plate needs to be adjusted.
3. How to relocate, whether to smoothly relocate, you need to carefully sort out the rectification business, the length of time the business is allowed to be interrupted.
4. For a smooth relocation, first purchase a set of equipment, complete the installation and single station commissioning at the new site.
5. In two directions, one direction is removed. Half of the new equipment will be configured. After the cutover is completed, the other direction will be removed and the drill will be done in advance.
6. Optical layer optimization in advance.
That would be all on equipment relocation. Thanks for reading this post!