CH222 V3 parts replacement

0

Replace the CH222 V3 components by referring to section "Installing and Removing the Components of the CH222 V3" in the CH222 V3 Compute Node V100R001 User Guide: http://support.huawei.com/enterprise/en/doc/DOC1000053377/?idPath=7919749%7C9856522%7C21782478%7C19955021%7C21070743

Other related questions:
CRUs and FRUs of OceanStor V3 unified storage systems
You can obtain the lists of customer replacement units (CRUs) and field replaceable units (FRUs) of OceanStor V3 storage systems from the following link: CRUs and FRUs .

Applying for server spare parts
Please dial the Huawei hot line 400-822-9999 to confirm whether the faulty part needs to be replaced. If replacement is required, Huawei engineers will help you submit an order. Obtain the server SN before you make the call.

Powering off an E9000
Power off an E9000 as follows: 1. Power off the blades or switch modules in an E9000 chassis using the MM910 Web interface. For details, see http://support.huawei.com/ehedex/pages/DOC1000053358YEF0907R/08/DOC1000053358YEF0907R/08/resources/en/osca/smma_help_r2/it_osca_smma_900020.html. 2. Disconnect the E9000 power cable from the mains supply.

If you have more questions, you can seek help from following ways:
To iKnow To Live Chat
Scroll to top