Powering on an E9000

2

Power on an E9000 server as follows:
? If the E9000 chassis is not powered on, connect the power cables to the mains supply. The blades, switch modules, and management modules will be powered on with the chassis.
? If the chassis is powered on but the blades, switch modules, and management modules are not installed, install the modules. These modules will be automatically powered on after being installed.
? In routine maintenance, power on or off the blades or switch modules on the MM910 Web interface. For details, see http://support.huawei.com/ehedex/pages/DOC1000053358YEF0907R/08/DOC1000053358YEF0907R/08/resources/en/osca/smma_help_r2/it_osca_smma_900020.html.

Other related questions:
Powering off an E9000
Power off an E9000 as follows: 1. Power off the blades or switch modules in an E9000 chassis using the MM910 Web interface. For details, see http://support.huawei.com/ehedex/pages/DOC1000053358YEF0907R/08/DOC1000053358YEF0907R/08/resources/en/osca/smma_help_r2/it_osca_smma_900020.html. 2. Disconnect the E9000 power cable from the mains supply.

E9000 UMC
The MZ510 and MZ512 support Universal Multi-Channel (UMC), that is, multi-PF. Each physical port supports multiple physical functions (PFs), which divide a port into multiple independent logical channels. For details about related applications, see the NIC user guide. For example: http://support.huawei.com/ehedex/hdx.do?docid=DOC1000053357&lang=zh&id=ZH-CN_TOPIC_0009315440

E9000 upgrade
For details about how to upgrade the E9000, see: http://support.huawei.com/huaweiconnect/enterprise/thread-280945.html

E9000 CNA
A converged network adapter (CNA) is a 10GE network interface card (NIC) that supports the Fibre Channel over Ethernet (FCoE) function. The MZ510 and MZ512 of E9000 servers are CANs.

Impact of restart on E9000 switch module TR mode
If the TR mode is set for E9000 switch modules, the restart will not change the TR mode.