If your PV Plant is configured with the SUN2000L inverter, SafetyBox/ LG Chem battery and energy meter Carlo Gavazzi EM111DINAV81XS1X , it will operate abnormally or will affect the communication with the SafetyBox/ battery. 
The solution is to contact the Carlo Gavazzi team or your distributor and ask for the replacement of the meter with the updated version EM111DINAV81XS1X 08.



