Optical Transmission Equipment

Alaul
Alaul  Diamond  (1)
7 years 11 months ago  View: 1066  Reply: 8
1F
This topic describes the preparations for the installation. Read this topic and check the installation requirements before the installation.
  •  Required Documents and Tools: To ensure the efficient installation of the WDM equipment, ensure that required documents, tools and instruments have been available.
  • Pre-installation Check: Before the installation of Huawei WDM equipment, the customer must ensure that the equipment room, power sources, ground cables, optical cables, and other materials are ready. The installation may begin only all conditions for the installation meet anticipated requirements.
  • Unpacking Equipment: This topic describes how to unpack cabinets, subracks, and boards.
  • Checking Internal Cables and Fibers: After unpacking a cabinet, check the cables and fibers internally routed inside.

Armetta
Armetta  Diamond 
7 years 10 months ago
2F
This document is very well done

abrahim
abrahim  Diamond 
7 years 10 months ago
3F
Thanks for sharing the details..........
abrahim
abrahim  Diamond 
7 years 10 months ago
4F

After unpacking a cabinet, check the cables and fibers internally routed inside. 

It can be done perfectly during installation the equipment.

zsiddique
zsiddique  Platinum 
7 years 10 months ago
5F
As VAS network planning engineer, It will help a lot for installing a new equipment.
zsiddique
zsiddique  Platinum 
7 years 10 months ago
6F
In the Pre-installation Check: Pls include room condition check such as room humidity, temperature etc which will keep healthy the equipment.
mjali
mjali  Platinum 
7 years 10 months ago
7F
Pls give the details....
benjamin.omeke
benjamin.omeke  Diamond 
7 years 10 months ago
8F
Thanks for sharing.
user_2837311
user_2837311  Diamond 
3 years 10 months ago
9F
useful post, thanks