Personnel Preparation
|
In the cooperative installation project, the technicians of the cooperator install the equipment with the assistance of the technical personnel of the customer. In the non-cooperative installation project, the technical personnel of Huawei install the equipment with the assistance of the technical personnel of the customer. The technical personnel from the cooperator should receive systematic training given by Huawei so as to master the procedures of system installation and commissioning. Only after they have obtained the related operation certificates can they implement the installation and commissioning. The technical personnel of the customer should also be trained beforehand by Huawei to master the installation and construction methods. Number of people required in the installation depends on the specific arrangement on project progress and the installation condition. Normally 3 ~ 5 engineers are required. |