Installation procedure

aamallik
aamallik  Diamond  (1)
7 years 11 months ago  View: 961  Reply: 1
1F

Procedure

  1. Checking the equipment room construction.


    Check the area, height, load bearing capacity, and groove distribution of the equipment room by referring to Requirements for the Equipment Room.


  2. Checking the equipment room environment.


    Check the environment of the equipment room by referring to Requirements for the Operating Environment.

    Check the environment of the equipment room and ensure that the environment meets the following requirements:
    • The equipment room has normal, standby, and emergency lighting systems.
    • Air-conditioning and ventilation system can maintain proper temperature and humidity in the equipment room.
    • Effective ESD measures are taken for the equipment room.