Quidway S9300 Support Hot Backup

abrahim
abrahim  Diamond  (1)
7 years 10 months ago  View: 1033  Reply: 1
1F

The S9300 supports hot backup. When the master main control board fails, the S9300 automatically switches services to the slave board without interrupting the services. The software versions of the master board and slave board must be the same.

You can also run the slave switchover command to trigger the active/standby switchover manually.

[Quidway] slave switchover Caution!!! Confirm switch slave to master[Y/N]?y

Ensure that data on the master board is backed up to the slave board before you trigger the master/slave switchover. That is, the slave board is in the real-time backup state. If the board is backing up data, you cannot perform switchover. In this case, you can run the display switch state command to view the status of the slave board.

<Quidway> display switch state Master MPU: Realtime and routine backup.  Slave MPU: Receiving realtime and routine data
zsiddique
zsiddique  Platinum 
7 years 10 months ago
2F
Very useful document Thanks