Performing a Redundancy Switchover of UPCC

abrahim
abrahim  Diamond  (1)
7 years 10 months ago  View: 932  Reply: 1
1F


Precautions

  • Perform a redundancy switchover only after you have confirmed that the redundancy UPCC is available and have obtained consent from Huawei headquarters.
  • If a switchback is required, perform the operation only after you have obtained consent from Huawei headquarters.

Switchover Procedure

Perform checks before a switchover.

Perform a switchover only after all check results are normal.
  1. Check that all modules of the redundancy UPCC are normal on the device panel.
  2. Check that all alarms are cleared on the redundancy UPCC.
  3. In the MML Command- USCDB windows of the active and redundancy UPCCs, run the following commands to check data consistency:
    DSP MDBVERIFY: MDBVR=RUNR, UDT=STADATA; DSP MDBVERIFY: MDBVR=RUNR, UDT=DYNDATA; DSP MDBVERIFY: MDBVR=LASTFR, UDT=STADATA; DSP MDBVERIFY: MDBVR=LASTFR, UDT=DYNDATA; DSP MDBVERIFY: MDBVR=RUNR, UDT=GBLANDROUTEDATA; DSP MDBVERIFY: MDBVR=LASTFR, UDT=GBLANDROUTEDATA; 

    If the value of InconsistentObjects in each record is less than 20, data is consistent.

Armetta
Armetta  Diamond 
7 years 10 months ago
2F
Useful commands