Sharing Experience: Cross connection in LOG board at OSN6800

Tanjil
Tanjil  Platinum  (1)
7 years 11 months ago  View: 3085  Reply: 14
1F
I observed that if   two LOG( for example LOG-A & LOG-B) is cross-connected in following ways
RX1/TX1(LOG-A) connected to LP-8(LOG-B)
RX2/TX2(LOG-A) connected to LP-7(LOG-B)
RX3/TX3(LOG-A) connected to LP-6(LOG-B)
RX4/TX4(LOG-A) connected to LP-5(LOG-B)

then it is not possible to cross connect remaining unused RX/TX ports of LOG-A with remaining unused LP ports of LOG-B. hence you should be careful during this type of planning.


It may be due to internal BUS limitation. Does anybody experience this type of thing?

hudichang
hudichang  Senior 
7 years 10 months ago
2F

The LOG board hast this limitation according to confirmation and test.

Can you tell more information regarding your operation?

I will help you solve question.

email:

hudichang@huawei.com

Nahid
Nahid  Diamond 
7 years 10 months ago
3F
Nice sharing
Felipe
Felipe  Platinum 
7 years 11 months ago
4F
Thanks for shering your experience! Good post!
hudichang
hudichang  Senior 
7 years 10 months ago
5F

回复 8 楼

Hi tanjil: can you tell us what ports are used by SNCP protection. I knew all the unused ports can be used for cross-connection.
hudichang
hudichang  Senior 
7 years 10 months ago
6F

引用 8 楼



Hi hudichang, this was the operation I performed more than two years ago during SNCP configuration. At that time local huawei expert also ensured me. Thats why I shared with you.

tanjil 发表于 2014-05-27 20:14

Hi tanjil: can you tell us what ports are used by SNCP protection. I knew all the unused ports can be used for cross-connection.
Tanjil
Tanjil  Platinum 
7 years 10 months ago
7F

Reply 2 #

Thanks
Neen
Neen  Platinum 
7 years 10 months ago
8F
saad_soufi
saad_soufi  Medium 
7 years 10 months ago
9F

Already faced this issue in our network, i thinks it is physical limitation of the backplan/electrical BUS or the board version itself

maybe the issue will be solved with new board version with newer hardware


Tanjil
Tanjil  Platinum 
7 years 10 months ago
10F

Quote 6 #

The LOG board hast this limitation according to confirmation and test.

Can you tell more information regarding your operation?

I will help you solve question.

email:

hudichang@huawei.com

h00178324 Posted on 2014-05-24 09:12


Hi hudichang, this was the operation I performed more than two years ago during SNCP configuration. At that time local huawei expert also ensured me. Thats why I shared with you.

1/2Page