[UGW9811] Product Commissioning

f00150794
f00150794  Senior  (1)
7 years 11 months ago  View: 3424  Reply: 1
1F
 

1. Application Description

1) Service Description

After installing hardware and software and configuring interconnections with other NEs, you are about to enter the basic product commissioning stage in which you will commission basic product functions before feature configuration.

2) Documentation Description

We provide you with documents that cover all procedures for commissioning basic product functions.

  • Product commissioning preparations: Before product commissioning, check hardware and network environments to ensure that equipment is in normal physical conditions.
  • Local commissioning: After checking physical environments, check basic information for accuracy. The basic information includes the software system, licenses, and system time. This ensures that the local equipment works properly and suits interconnection commissioning.
  • Interconnection commissioning: After local commissioning, check the connection status between the UGW9811 and the peer NE and ensure that the UGW9811 properly communicates with other NEs.
  • Local LMT commissioning: Before performing local operations on the UGW9811 using the LMT, commission the LMT basic functions, FTP client, and message tracing system to ensure that the LMT can work properly.
  • Access commissioning: After operation and maintenance (O&M) commissioning is complete, check the user access to the UGW9811 and ensure that authorized users can transparently access packet data networks (PDNs) and use basic data services.
  • Basic services commissioning: After access commissioning is complete, check the operating status of basic services on the UGW9811 and ensure that users can properly use data services, such as WAP services, web browsing services, blackberry, MMSs, and emails.
  • Interoperating network commissioning: After deploying interoperating networks, verify whether users can be handed over between different networks.

2. Highlights

To meet your application requirements, we are motivated to continuously improve the quality of PS service-related documents.

The commissioning-related document provides detailed scenarios, prerequisites, and procedures. You can easily complete the basic function commissioning by following the document descriptions.

3. Reference Documents

Product

Version

Link

UGW9811

UGW9811 V900R010C01

Product Commissioning

UGW9811 V900R011C00

Product Commissioning

UGW9811 V900R012C10

Product Commissioning

Armetta
Armetta  Diamond 
7 years 10 months ago
2F
documentation very useful for my job