Whether copper fittings are equipped for cabinets delivered to sites

Copper fittings are not pre-installed on PDUs during delivery.
The TN16PDU consists of two parts: A and B, which back up each other. Parts A and B each receive four �?8 V/�?0 V power supplies and output four power supplies for subracks in the cabinet.
Whether copper fittings are required is determined by the current of the power supplied by the power supply equipment in the equipment room:
When eight 63 A power supplies are provided, no copper fitting is required.
When four 125 A power supplies are provided, copper fittings are required for dividing each 125 A power supply into two 63 A power supplies.

Scroll to top